top of page
2S0A3730-4.jpg

Recent Renovations

College Station Middle School

Progressive Commercial Aquatics

At College Station Middle School, an extensive renovation project was completed of the 8-lane competition pool and pump room. This project included incorporating anchors to facilitate an ADA lift and water polo goals, in addition to the installation of new stainless-steel handrails, ladders, and starting blocks. The facility’s pump room saw the installation of a new UV system, pump motor, an automated fill system, a chemical monitoring system, and an Acid-Rite chemical feeder. The renovation also included the replacement of the waterline, gutter, and parapet tile, with a restoration of the water polo course tile. The outdated sand filter system was replaced by a singular Neptune Benson high-rate sand filter. Creating a balance between innovation and sustainability, the Accu-tab chlorinator system and the preexisting pool heating system were reused, a new pool vacuum was procured, and the safety equipment was refurbished. Most notably, the entirety of the above-ground pool circulation piping underwent replumbing and the pool shell was replastered.

bottom of page